Pads operation optimization based on reservoir and fluid properties, and production data analytics. Subcool impact on rate and SOR.
Reservoir surveillance using observation wells within drainage areas and caprock zones.
Top gas re-pressurization strategy
Tapered MOP operation strategy for SOR optimization based on simulation, 4D and caprock geomechanics study.
Define circulation conversion criteria based on specific project to ensure circulation quality and conformance along the wellbore. Optimize the start up sequencing coordinating with surface facilities.
Mid to longer term shut-in impact on steam chamber cool down, condensation, dewatering and potential issues from restart. Conduct the scenario analysis and risk assessment with different shut-in and re-ramp up durations.